Product Description
Application of Oxygen Lancing Pipe 1. Convey oxygen or other gases for steelmaking electric arc furnace. 2. Inject powdered additives to adjust the steel grade or refine special steel. 3. Accelerate the melting of furnace charge, and shorten the melting time. 4. Accelerate the oxidation of impurities,strengthen decarburization,remove slag,shorten refining time. |
Size of Oxygen Lance Pipe | Working Pressure | ||||
DN | Inch | OD(mm) | Length(mm) | 5 Bar | 10 Bar |
6 | 1/8" | 10 | 1000/1800/3000/6000 | ca.15 Nm3/h | ca.35 Nm3/h |
8 | 1/4" | 13.5 | 1000/1800/3000/6000 | ca.45 Nm3/h | ca.90 Nm3/h |
10 | 3/8" | 17 | 3000/5000/5500/6000 | ca.90 Nm3/h | ca.180 Nm3/h |
15 | 1/2" | 21.5 | 3000/5000/5500/6000 | ca.160 Nm3/h | ca.290 Nm3/h |
20 | 3/4" | 26.7 | 3000/5500/6000/9000 | ca.360 Nm3/h | ca.700 Nm3/h |
25 | 1" | 33.4 | 3000/5500/6000/9000 | ca.600 Nm3/h | ca.1200 Nm3/h |
32 | 1-1/4" | 42 | 5000/5500/6000/9000 | ca.1200 Nm3/h | ca.2000 Nm3/h |
40 | 1-1/2" | 48 | 5000/6000/9000/12000 | ca.1900 Nm3/h | ca.3300 Nm3/h |
50 | 2" | 60 | 5000/6000/9000/12000 | ca.3100 Nm3/h | ca.5600 Nm3/h |
Raw Material: Carbon Steel End Protector: Plastic Pipe Cap |
1. Are you Factory or Trading? We are factory with ISO 9001:2015 certified 2. How to guarantee quality? Always a pre-production sample before mass production; Always final Inspection before shipment; 3. What is your payment service? Accepted Delivery Terms: FOB, CFR, CIF, EXW; Accepted Payment Currency: USD, EUR, CNY; Accepted Payment Type: T/T, L/C; More requirements,Please send inquiry to us,let's confirm them directly. |