DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar (diameter 6-200mm)

Buy high-quality DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar from our factory. Available in diameters ranging from 6-200mm. Order now!
Request a Quote

PRODUCTS DETAILS

Product Description

DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar (diameter 6-200mm)

Equivalent grades:
GBDINAISIJIS
Cr12Mo1V11.2379D2SKD11

Chemical composition:
CSiMnSPCrNiCuVMo
1.40-1.60.60.60.030.0311.5-130.250.301.000.70

Introduction:
   D2 steel is a high wear resistant micro deformation cold working die steel, belonging to air hardening tool steel. With high quality fraction of carbon and high chronic, the hardness can up to 60HRC after heat treatment, but malleability,toughness,rust resistance is not good and the surface of the steel is also difficult to be polished. 
   With the development of cold stamping products moving towards high accuracy,high efficiency,varieties, we require the mould steel should has good wear resistance and high toughness. 
   Compared with Cr12MoV steel, this D2 die steel adds Mo,V compositions,changed the steel cast structure, improved the morphology of ledeburite , toughness and wear resistance are better than Cr12MoV steel, improved the service life as well.Because of the yield point and plastic deformation resistance is higher than Cr12MoV steel, so that forging performance and hot molding properties are a little weak than Cr12MoV steel.

 
Hardness:

annealing ≤255HB, impression diameter≥3.8mm;
quenching ≥59HRC

 
D2 steel heat treatment regime:
quenching ,820±15ºC, preheat ,1000±6ºC(salt bath) or 1010±6ºC heating,
keep warm 10~20min, air cooling,200±6ºCtempering 

Application:
1) used for freezer compressor rear cowl mould quenching hardening 56~58HRC.
2) because of V,Mo composition are higher than Cr12MoV steel, so that it has better combination property and will instead of Cr12MoVsteel gradually.
3) making cylindrical die roll,destage mixing pad cold punching mould and the service life is5-6 times longer than Cr12MoV steel.

 
Feature:
1. High high wear resistant;
2. micro deformation;
3. Long service life;
4. Good toughness;
5. high accuracy, high efficiency, varieties.


Available size(mm):
Flat Bar Size(mm)Round bar Size(mm)
ThicknessWidthLengthDiameterLength
6-200155-8103000-600014-2003000-6000

Delivery days: 
For abundant stock, 7-15 days.
For customized products, 30-50 days.


Our service:
1, Sizes, materials and others are all at your requirements and can be changed;
2, Price varies on materials, dimensions, finish craft and different payments;
3, We are direct manufacture in machinery manufacturing work with experience of several decades;
4, Detail production design will be made according to information you offered;
5, We have adequate inventory, so that we can quick delivery;
6, The most important is that we have advanced equipment.


Products show:
DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar (diameter 6-200mm)
DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar (diameter 6-200mm)


Strict Quality Control
DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar (diameter 6-200mm)

Loading Photo
DIN1.2379 D2 SKD11 Cr12Mo1V1 Die Steel Round Bar (diameter 6-200mm)


FAQ:
Q: Are you a manufacturer or merely a trader?
A: We are trading company act as exporting Steel Products with our own factory,

we can manufacture the products as in cutomer's requirement,wholesale and retail all kinds of domestic mould steel,the price we offered is very competitive compared with other agents.

Q: How do you guarantee the quality of your product?
A: Firstly, we can provide the certificates from the third party, such as SGS, CE,ISO if you need. Secondly, we have a complete set of inspection system and every process is checked by QC. Quality is the lifeline of enterprise survival. Third,the products we export are mainly from ShaGang group, WenFeng group, XingCheng group, DongTe group,DaYe and so on, the quality are certained.
 
Q: Delivery time?

A: We have ready stock for most of material grades in our warehouse. If the material don't have stock, the delivery lead time is about 30-50 days after receiving your prepayment or firm order.
 
Q: What is the payment term?
A:100% T/T  or 30%T/T deposite prepaid, 70%Balance L/C.
 
Q: Can we visit your company and factory?

A: Yes, warmly welcome! We can book the hotel for you before you come to China and arrange our driver to our airport to pick you up when you come.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours