Product Description
Rebar is the common name for hot rolled ribbed steel bars. The grade of ordinary hot-rolled steel bar is composed of HRB and the minimum yield point of the grade. H, R, and B are the first letters of the three words Hotrolled, Ribbed, and Bars respectively. Hot-rolled ribbed steel bars are divided into three grades: Grade II HRB335 (the old grade is 20MnSi), Grade III HRB400 (the old grades are 20MnSiV, 20MnSiNb, 20Mnti), and Grade IV HRB500.
Specification
Item | Value |
Standard | DIN |
Grade | HRB400 |
Length | 25mm50mm or according to the customer |
Place of Origin | China Tianjin |
Brand Name | yuantaiderun |
Application | construction |
Tolerance | ±3% |
Processing Service | Bending, Welding, Decoiling, Cutting, Punching |
Alloy Or Not | Is Alloy |
Delivery Time | 15-21 days |
Usage | Structure |
MOQ | 25 Tons |
Technical | Hor Rolled |
Package | Waterproof |
TRADE TERM | FOB CFR CIF |
Material | Carbon Steel Grade B |
Delivery Time | 7-30 Working Days |
Features
Production
Application
Anping Zhonghao Traffic Safety Facilities Co.,Ltd is located in Anping Hebei China . we specialize in various kinds of Welded wire fence panels, temporary fence,chain link fence etc. products.
Area: 30000m2
No. of Employees: 150 people
No. of QA/QC Inspector(s): 8 people
Export Markets: Europe, South America, Australian, North America etc.
Certificates: BV report, CE certificate, ISO9001 certificate, SGS certificate
Q: Are you a manufacturer?
A: Yes,we have specialized in this field more than 10 years experience.
Q: How can we guarantee quality?
A: Always a pre-production sample before mass production;
Always final Inspection before shipment;
Q: why should you buy from us not from other suppliers?
A: Our company has strong technical force, complete equipment, professional management personnel, technical personnel and professional equipment construction team, and has a price advantage and a complete quality inspection system.
Q: How is your delivery time?
A: We always prepare enough stock material for your urgent requirement. the delivery time is 7days for all the stock material.
We'll check with our production department for the non-stock items to offer you the exact delivery time and producing schedule.