Basic Info.
Model NO.
OD: 21.3 MM - 273 MM
Standard
ASTM, GB, JIS, DIN, API, BS, ASTM A106-2006
Grade
Q195-Q345, A53-A369, St35-St52, 10#-45#, Q235, Q34
Thickness
1mm - 10mm
Outer Diameter
21.3 mm - 273 mm
Tolerance
+/-5%
Processing Service
Bending, Welding, Punching, Cutting
Secondary or Not
Non-Secondary
Pipe Ends
Plain, Bevel, Threaded or Grooved
Alloy or Not
Non-Alloy
Product Name
Pipe, Tube
Length
as Customers′ Requirement
Zinc Coating
220 G/M2 ( or Customized)
End Protector
None or Plastic Caps
Place of Origin
Tianjin, China
Transport Package
Packing by Steel Strips
Specification
21.3-273MM / 1/2"-10" / DN 15-250
Trademark
TFCO
Origin
Tianjin, China
HS Code
73063090
Production Capacity
70000 Ton / Year
Product Description
Overview |
Quick Details |
Standard | ASTM, GB, JIS, DIN, API, BS, ASTM A106-2006, ASTM A53-2007, ASTM A 53M-2007, ASME B36.10M-2004, GB /T 3091-2001, GB/T 13793-1992, JIS J3444-2006, JIS J3466, DIN 2444, API 5L, BS 1387, BS 1139, BS 4568, BS EN 39 | Grade | Q195-Q345, A53-A369, ST35-ST52, 10#-45#, Q235, Q345, Q195, Q215,A53(A,B), A106(B,C), ST 42, 10#, 20# |
Thickness | 1MM - 10MM | Section Shape | Round |
Outer Diameter | 21.3 MM - 273 MM | Place of Origin | Tianjin, China |
Application | Structure Pipe | Technique | ERW |
Certification | ISO9001 ISO18001 UL | Surface Treatment | Galvanized or Painted or Black |
Special Pipe | Thick Wall Pipe | Alloy Or Not | Non-Alloy |
Tolerance | ±5% | Type | Weld Steel Pipe |
Processing Service | Bending, Welding, Punching, Cutting | Product Name | Pipe, Tube |
Secondary or Not | Non-secondary | Length | As Customers' Requirement |
Material | Carbon Steel (Q195, Q235, Q345) | Zinc Coating | 220 g/m2 ( or Customized) |
Pipe Ends | Plain, Bevel, Threaded or Grooved | End Protector | None or Plastic Caps |
Packing & Delivery |
Packing | Packing by steel strips |
Regular Size ( Steel Pipe Profile ) |
Size (Outer Diameter) | Wall Thickness | Length |
21MM ( 1/2") | 1.4MM --2.75MM | 6M (or Customized) |
26MM (3/4") | 1.4MM --2.75MM | 6M (or Customized) |
33.4MM (1") | 1.4MM -- 3.5 MM | 6M (or Customized) |
42.2MM(1 1/4") | 1.4MM -- 3.5 MM | 6M (or Customized) |
48.3MM (1 1/2") | 1.5MM -- 4.0 MM | 6M (or Customized) |
60.3MM (2") | 1.5MM -- 4.0 MM | 6M (or Customized) |
73MM (2 1/2") - ASTM STANDARD | 1.8MM -- 5.5 MM | 6M (or Customized) |
76MM (2 1/2") -- BS STANDARD | 1.8MM -- 5.5 MM | 6M (or Customized) |
88.9MM (3") | 2.0MM -- 5.5 MM | 6M (or Customized) |
114.3MM (4") | 2.0MM -- 6.5 MM | 6M (or Customized) |
141.3MM (5") | 2.5MM -- 6.5 MM | 6M (or Customized) |
165MM(6") - BS STANDARD | 2.5MM -- 7.5 MM | 6M (or Customized) |
168.3 MM (6") - ASTM STANDARD | 2.5MM -- 7.5 MM | 6M (or Customized) |
219.1MM (8") | 2.5MM -- 9.0 MM | 6M (or Customized) |
Pipe Quality Control |
Steel Pipe Packing & Shipping |
Company Profile |
Tianjin Friend Steel Group with "TFCO" Brand has 5 subsidiary compainies include Tianjin Friend Steel Pipe Co.,Ltd&Tianjin Steel Galvanization Co.,Ltd&Tianjin Friend Metal Material Co.,Ltd&Tianjin Friend Import&Export Co., Ltd&Tianjin Steel Import&Export Co., Ltd. Built in 1999 with registered capital of RMB 30 million, we have an annual production capacity of 400,000 MT and exporting quatity of 60,000MT.
Our Honor |
Our Team |
FAQ
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly.
2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet.
3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.
4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100 workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.
5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.
6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.
7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.
A: One full 20ft container,mixed acceptable .
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly.
2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet.
3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.
4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100 workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.
5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.
6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.
7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.